HANZ Furniture has been buying furniture in Foshan since 2018 — not a marketplace, not a directory, but a small team that goes to the factory on your behalf.
We are based in the city where a very large share of the world's furniture is actually made — and we work for the buyer, not for the seller.
We started in Foshan in 2018. We are not a platform, and we do not list factories. We buy on behalf of people who cannot get on a plane every time they need a sofa, a wardrobe, or a hotel's worth of guest rooms.
The team is small, deliberately. Our core members have spent more than fifteen years in this trade, and even the support staff who answer your messages and chase your order have worked in it for at least three years. That matters more than it sounds: in this market the difference between a good order and a bad one is usually one person noticing something at the right moment — a changed material, a shifted delivery date, a factory that has quietly subcontracted the upholstery.
Nothing is handed to a stranger. The person who quotes your order is the person who follows it through production, inspection and loading.
It is not a directory. It is a working list: factories we have shipped from, visited, and in some cases been through a failed batch with.
Sofas, beds, dining, storage, outdoor and custom joinery — mid-market, upper-mid and high-end, in every style from Italian minimalist and mid-century to French, new Chinese and industrial. We move between bands for the same client, because a living room and a rental apartment rarely deserve the same budget.
Rugs, lighting, decorative objects, artwork, fabrics and soft furnishings. These are the items that decide whether a finished room looks designed or merely furnished, and they are also the items most buyers end up sourcing separately, at retail, at three times the price.
Building materials, tiles, stone, doors and gym equipment — the parts of a project that are not "furniture" but travel in the same container. Coordinating them here is usually cheaper than shipping them from three different countries.
A whole house is almost never one supplier. It is twenty or thirty purchase orders that have to agree with each other — the oak on the dining table and the oak on the sideboard, the brass on the lamps and the brass on the handles, the delivery dates of everything that has to arrive before the container closes.
Knowing which factories hold tolerance across a forty-piece repeat order, and which ones only look good on the first sample, is the part of this job that does not photograph well. It is also the part you are actually paying for.
The same list is what makes EU timber rules survivable: not every factory can document where its timber was cut, but a buyer only needs enough of them to be able to choose. What EUDR actually asks for →
Three things that are usually vague in this industry, stated plainly.
One agreement. You sign a single cooperation agreement with us, and it covers the whole project wherever the goods come from. A separate contract and a separate international transfer for each of twenty factories would mean twenty rounds of paperwork and a bank charge on every payment.
One schedule, but money goes to the factory. We arrange one payment schedule across every supplier — deposit round, balance round before dispatch — and each factory is still paid into its own account. We never hold your goods payment, which means we have nothing to gain from a bigger invoice.
5%, and no rebate. Our income is the 5% service fee on the order value. We take nothing from the factory, the forwarder or the container. The factory quotation reaches you unchanged, line by line, before you approve anything.
Every order runs through inspections at fixed points — before production on materials, during production on construction, and once more before packing against the approved sample. You get photographs and video at each of them, whether or not the news is good.
Before a mixed container is loaded we check the packing specification and the loading plan, because damage in transit is almost never caused by the shipping line. It is caused by a carton that was never designed to be stacked.
If a batch fails, it does not ship. We tell you what failed and what it costs to fix, and the decision stays yours.
Usually a whole apartment or a house, sometimes one room. You send a floor plan and a budget; we shortlist, quote and sample, and you approve everything from photographs before it is made.
You have the drawings and the specification; you need someone who can hold a factory to them. We work to your schedule, keep your client relationship, and stay invisible to them unless you want otherwise.
Hotels, restaurants, offices, schools and clinics — quoted from a room schedule rather than a mood board, with repeatability and replacement parts treated as part of the brief.
Not a factory. We do not own a production line, which is exactly why we can move your order to a different supplier when the work is not good enough.
Not the cheapest quote you will receive. There is always someone on the internet offering a lower price, usually by sourcing a lighter frame or a thinner veneer. We will tell you when importing does not add up — a single sofa, or a landed cost within reach of your local retailer, is usually not worth the freight.
Not a logistics company. We book and coordinate freight, but the forwarder is named on your documents and you see their invoice. We are not marking it up and calling it ours.
A floor plan and a rough budget is enough to start. You will get a shortlist and a realistic range before anyone asks you for money.
Message us on WhatsApp Not sure of your style? Take the quiz